Work Group to Submit Report on Reykjanesbraut Closure

Sigurður Ingi Jóhannsson

A work group appointed by Minister Sigurður Ingi Jóhannsson to review the closure of Reykjanesbraut in December is expected to submit a draft plan to the Ministry of Infrastructure next week, Mbl.is reports. The closure of Reykjanesbraut led to numerous flight cancellations and delays.

Reykjanesbraut closure leads to flight cancellations, delays

Following heavy snow in the capital area during the days leading up to Christmas, Reykjanesbraut – the road leading to Keflavík Airport – became impassable. The closure led to numerous flight delays and cancellations, with many travellers expressing their criticism of the Icelandic authorities.

Speaking to Mbl.is in December, Minister of Infrastructure Sigurður Ingi Jóhannson stated that the situation was unacceptable: “I have to say, right now, we have to get over this and ensure, as far as that’s possible, that Reykjanesbraut is not closed while the airport is open.”

Sigurður Ingi subsequently appointed a work group composed of representatives from the Icelandic Road and Coastal Administration, the National Police Commissioner, and the Suðurnes police chief. The work group was tasked with reviewing the events in December and drafting a plan on how best to deal with similar situations.

“We are working hard on the report in collaboration with these groups,” Hjördís Guðmundsdóttir, Director of Communications for the Department of Civil Protection and Emergency Management, told Mbl.is this morning. The work group is expected to submit its report on Tuesday, January 10.

“We scrutinise everything we do, so it’s natural for us to scrutinise this,” she added.

Single-Lane Bridge Replaced with Double-Lane Bridge Near Kirkjubæjarklaustur

kirkjubæjarklaustur bridge iceland

Sigurður Ingi Jóhannsson, Minister of Infrastructure, took part in the official opening of the new bridge over Jökulsá on the south coast of Iceland on Friday, October 21.

With the appearance of the new bridge, there will no longer be any one-way bridges between Reykjavík and Kirkjubæjarklaustur, a town on the south coast of Iceland. The improvement is a major one for the region, meaning that the drive east along the south coast will be all the more navigable.

Also present at the opening ceremony were Anton Kári Halldórsson, mayor of Rangárþing eystra, and Einar Freyr Elínarsn, mayor of Mýrdalshreppur municipality.

After the ceremony, minister Sigurður was the first to drive over the new bridge, inaugurating this latest addition to Iceland’s road system.

In his address at the ceremony, minister Sigurður outlined his ministry’s plans to get rid of single-lane bridges throughout the nation: “Today we move one step closer to that goal. Four years ago, 37 bridges on the Ring Road were single-lane, now there are 32, and there will be 31 when the new bridge opens today. And there is no let up in construction. I am hopeful that we will be able to reduce the number of them to 29 right before the end of the year, with new bridges openings on both Hverfisfljót and Núpsvötn later in the year. There are also three single-lane bridges that will be diverted around the Ring Road when traffic is allowed over the new bridge over the Hornafjörður River.”

According to information from the Road Administration, the new bridge is some 163 m [535 ft] long, with a total width of 10 m [33 ft]. The bridge it replaces was built in 1967, part of the construction of Iceland’s Ring Road.